| Transportation/HUD |
|
|
| Requester |
Project
Name |
Amount
Requested |
Program
Description |
| Blackburn College |
Science
Building Wiring, Ventilation and Plumbing |
$2,000,000 |
Funding
for this project would be used for the replacement of the wiring, ventilation
and plumbing systems of the Science Facility at Blackburn College. |
| Calhoun County |
Highway
1 Resurfacing |
$2,250,000 |
Funding
would be used for resurfacing a portion of Highway 1 in Calhoun County. Highway 1 is the main thoroughfare through
Calhoun County. |
| Calhoun County |
County
Office Consolidation |
$3,000,000 |
Funding
for this project would be used for the refurbishing of an existing building
in Hardin County, to centralize county offices into one building. |
| City of East Moline |
East
Moline Riverfront Development Assistance |
$675,000 |
Funding
for this project is for the development of the riverfront in East Moline,
including repairing levees and berms, as part of economic development
efforts. |
| City of East Moline |
East
Moline Downtown Improvements |
$475,000 |
Funding
would be used for the development of downtown East Moline, including the
acquisition and renovation of dilapidated structures, as part of economic
development efforts. |
| City of Galesburg |
N.
Seminary Street Bridge Grade Separation |
$2,484,000 |
Funding
would be used for the construction of a new railroad grade separation bridge
on North Seminary Street over the BNSF Railway. |
| City of Galesburg |
Soangetaha
Bridge Grade Separation |
$2,474,000 |
Funding
for this project will be used to replace the railroad grade separation bridge
on Soangetaha Road over the BNSF Railway. |
| City of Galesburg |
W.
Main St. (US 150) Bridge Grade Separation |
$2,500,000 |
Funding
for this project would be used for right-of-way acquisition for the
construction of a new railroad grade separation bridge on West Main Street
over the BNSF Railway. |
| City of Galesburg |
E.
Main St. (US 150) Underpass |
$2,500,000 |
Funding
for this project would be used for the preliminary engineering for the
construction of a new railroad grade underpass on East Main Street under the
BNSF Railway. |
| City of Galesburg |
South
Storey Lake Road Bike Trail Extension |
$280,000 |
Funding
for this project would be used for preliminary engineering, utility
relocation and right-of-way acquisition for a bike trail extension on South
Lake Storey Road in Galesburg, Illinois. |
| City of Galesburg |
Logistics
Park East Entrance |
$661,000 |
Funding
for this project would be used for the construction of an intersection for
the ease entrance road into Logistics Industrial Park on Galesburg, Illinois
to increase interest in investment in the park. |
| City of Keithsburg |
Marina
Project |
$700,000 |
Funding
would be used for the development of a boat marina in Keithsburg. |
| City of Moline |
I-74
Corridor Construction |
$5,000,000 |
Funding
would be used for right-of-way acquisition for the I-74 Bridge Corridor
construction project. |
| City of Morrison |
Highway
30/Union Pacific Separation Grade |
$3,812,000 |
Funding
for this project would be used for the construction of a new railroad grade
separation overpass in Morrison, Illinois over the Union Pacific Railway. |
| City of Rock Island |
Illinois
Route 92 Center Segment - Rock Island |
$325,000 |
Funding
for this project would be used for the development of the center segment of
Route 92. |
| City of Rock Island |
Armory
Park - Upper Riverfront Promenade |
$500,000 |
Funding
for this project would be used for the construction of a promenade in Armory
Park in Rock Island, Illinois, as part of economic development efforts. |
| City of Rock Island |
Rivervision
Bi-State Water Taxi |
$1,750,000 |
Funding
for this project would be used for the purchase of one vessel and the
construction of landing docks for a bi-state water taxi between Rock Island,
Illinois and Davenport, Iowa. |
| Decatur Park District |
Lake
Decatur Lakefront Development |
$100,000 |
Funding
would be used for initial planning and concept design of the lakefront at
lake Decatur as part of an economic development efforts. |
| Decatur Park District |
Twin
Bridge Road (U.S. 36) Improvement |
$2,135,000 |
Funding
for this project will be used to improve a segment of Twin Bridge Road and
U.S. Route 36 to provide adequate truck and regular vehicle access to the
Decatur Airport. |
| Decatur Park District |
Big
Creek Barn Revitalization |
$100,000 |
Funding
for this project would be used for the revitalization of the Big Creek Barn
Riding Center, including the replacement of siding, windows, and roof
structures. |
| IL Quad
City Chamber Foundation/East Rock River Corridor Study |
Feasibility
study for East Rock River Corridor bridge project |
$1,500,000
|
Funding
for this project would be used for a study to analyze the construction of a
bridge from John Deere Road/IL 5 across the Rock River. |
| Illinois DOT |
Quad
Cities Amtrak Service |
$13,500,000 |
Funding
would be used for track and capital investment for reestablishing rail
service between the Quad Cities and Chicago. |
| Macoupin County Highway Department |
County
Highway 14/Bunker Hill Road |
$2,500,000 |
Funding
for this project would be used for the reconstruction and realignment of
Brighton-Bunker Hill Road on County Highway 14 in Carlinville, Illinois,
including widening the pavement/shoulders and upgrading the pavement. |
| MetroLINK |
Rock
Island MetroLINK Transit Maintenance Facility |
$5,000,000 |
Funding
would be used to allow MetroLINK to construct a new 110,000 square foot
state-of-the-art Transit Maintenance Facility. |
| Mid-America Intermodal |
Railway
Spur Construction |
$3,350,000 |
Funding
for this project would be used for rail construction from an adjacent
bio-diesel plant tying into a terminal loading facility for the Mid America
Regional Port located in the South Quincy Development District in Quincy,
Illinois. |
| National Railroad Hall of Fame - Julie King |
National
Railroad Hall of Fame |
$100,000 |
Funding
for this project would be used for the final concept design phase for the
National Railroad Hall of Fame. |
| The Nature Conservancy/Fulton County Public Works and Highways
Department |
Emiquon
Preserve Public Access Project |
$1,355,380 |
Funding
for this project will be used to design and build a public access area to the
Nature Conservancy's Emiquon Preserve. |
| Warren County |
Annex
Building Renovation |
$410,000 |
Funding
would be used for the renovation of the Warren County Annex building, to
relocate non-judicial offices into one building. |
| Whiteside County Enterprise Zone |
U.S.
Route 30 Four lane development-Whiteside County |
$1,500,000 |
Funding
for this project would be used to create a four-lane route Highway 30 from
Rock Falls to Fulton, Illinois. |
| Energy and Water |
|
|
|
| Requester |
Project Name |
Amount
Requested |
Project
Description |
| City of Quincy |
Quincy
Hydro-Electric |
$500,000 |
Funding
for this project would be used to assist the City of Quincy in obtaining
licenses needed to construct hydroelectric generation facilities at Locks and
Dams #20, #21, and #22 to provide clean, efficient and renewable energy to
surrounding communities. |
| Mercer County |
Mercer
County Partnership Wind Project |
$1,000,000 |
Funding
for this project would be used for the construction and equipment purchase
for Phase II and III of the Mercer County Partnership Wind Project, which
will provide clean, renewable energy for multiple government units in Mercer
County. |
| U.S. Army Corps of Engineers (RI) |
Quincy
Bay Ecosystem Restoration |
$900,000 |
Funding
for this project would be used for maintenance dredging in lower/middle
Quincy Bay and modification to the access channel. |
| U.S. Army Corps of Engineers (RI) |
Village
of Andalusia Harbor Dredging |
$150,000 |
Funding
for this project would be used to perform maintenance dredging in Andalusia
Harbor, to remove sediment that has rendered the harbor and marina
inaccessible. |
| U.S. Army Corps of Engineers (RI) |
Mill
Creek Slough |
$500,000 |
Funding
for this project would be used to remove/clean out sediment and debris in the
diversion channel of Mill Creek, to remove blockages that are causing
elevated water levels at the local wastewater treatment facility. |
| U.S. Army Corps of Engineers (RI) |
Sunset
Marina Improvements |
$500,000 |
Funding
for this project would be used to allow the Army Corps to construct an
emergent dike in Sunset Marina, to reduce shoaling and the frequency of
maintenance dredging in the harbor entrance. |
| U.S. Army Corps of Engineers (RI) |
Emiquon
East |
$210,000 |
Funding
for this project would allow the Army Corps of Engineers to continue working
with the Nature Conservancy to turn
roughly 7,100 acres of the Thompson Drainage and Levee District into a
restored wetland. |
| U.S. Army Corps of Engineers (RI) |
Upper
Mississippi River System - Comprehensive Plan for Flood Control |
$500,000 |
Funding
would be used to continue the evaluation of plans for system flood damage
reduction on the Upper Mississippi River. |
| U.S. Army Corps of Engineers (RI) |
Upper
Mississippi River - Illinois Waterway System, IL, IA, MN, MO & WI |
$50,000,000 |
Funding
for this project would be used to provide for the first phases of
construction of new 1,200 foot lock chambers at L/Ds 20, 21, 22, 24, 25,
LaGrange and Peoria; implement small-scale navigation aids; and begin
ecosystem restoration projects along the Mississippi River and Illinois
Waterway. This program is also known as the Navigational and Ecosystem
Sustainability Program. |
| U.S. Army Corps of Engineers (RI) |
Upper
Mississippi River Restoration IL, IA, MN, MO & WI |
$20,000,000 |
Funding
would be used to address adverse impacts to the aquatic ecosystem caused by
maintenance of the river's navigation channel. This includes habitat
rehabilitation and enhancement projects that are effectively preserving and
improving fish and wildlife habitat on the river. |
| U.S. Army Corps of Engineers (STL) |
Illinois
Waterway |
$2,566,000 |
Funding
for this project would be used to maintain Army Corps projects on the
Illinois Waterway, including a nine-foot navigation channel through dredging
and associated channel patrol, water control, operations, maintenance, and
environmental work. |
| U.S. Army Corps of Engineers (STL) |
the
Mississippi River Between Missouri River and Minneapolis, Minnesota (Upper
River) |
$48,575,000 |
Funding
for this project would be used to maintain Army Corps projects on the
Mississippi River Between Missouri River and Minneapolis, Minnesota (Upper
River). Projects include maintaining a
nine-foot navigation channel, dredging, locks and dams, dike and revetment,
and environmental stewardship. |
| Labor, HHS, Ed |
|
|
|
| Requester |
Project
Name |
Amount
Requested |
Project
Description |
| Augustana College |
Longfellow Elementary Liberal
Arts Partnership |
$300,000
|
Funding
is requested for the Longfellow Elementary Liberal Arts Partnership between
faculty and students at Augustana and the elementary school to incorporate
liberal arts and science across the K-6 curriculum. |
| Augustana College |
Service
Learning in High Need Communities |
$310,000
|
Funding
would be used to place students in service-learning internships with the
local community to fulfill demonstrated needs in the community. |
| Augustana College |
Senior Inquiry
Summer Research Project |
$220,000
|
Funding
would be used to expand the College's Senior Inquiry research projects, in
which students works with faculty on projects in biology, medicine,
biochemistry, history, and other disciplines. |
| Blackburn College |
Science Facility Instrumentation |
$540,000
|
Funding
would be used for new instrumentation (instructional laboratory equipment,
desk top computers, main frame for computer laboratory, etc.) to accommodate expansion of the College's
physical and natural science programs and address increased enrollment. |
| Blackhawk College - Moline |
Meeting the
Challenges of Advanced Engineering/Manufacturing Technology Education |
$839,000
|
Funding
is requested to upgrade Black Hawk College's engineering technology
curriculum and laboratory to meet workforce challenges of the 21st Century. |
| Blackhawk College - Moline |
Illinois
Community College Sustainability Network |
$1,850,000
|
The
IL Community College Sustainability Network is a collaboration between 7 IL
Community Colleges (Black Hawk, Heartland, Kankakee, Lewis & Clark, John
A. Logan, Wilbur Wright, and Olive Harvey).
Funding would be used to strengthen Illinois community colleges'
capacity to promote and provide energy research, education and sustainable
practices in their districts across Illinois. |
| Community Health Care, Inc. - Quad Cities |
Community
Health Care Emergency Management Project |
$250,000
|
Funding
would be used for emergency power generators, medical equipment and tenant
improvements for a new public health facility in Moline, IL. |
| Community Health Improvement Center-Decatur |
CHIC
Space Renovation and Equipment |
$150,000
|
Funding
would be used for equipment and the renovation of the public health center to
better serve the low-income and uninsured residents of central Illinois. |
| Easter Seals-UCP (d.b.a. Easter Seals Peoria-Bloomington) |
Information
Technology for Rural Services Provision |
$625,000 |
Funding
is requested to help Easter Seals establish an integrated client services
management and communication system to provide more essential services to
children and adults with disabilities and their families across thirty-one
counties in Central Illinois. |
| Hillcrest
Home, Henry County |
Nursing Home Expansion |
$250,000
|
Funding
would be used for Phase I Expansion of the nursing home, which includes the
demolition of the poor farm building. |
| Macoupin County Public Health Department |
Macoupin
County Public Health Department Community Health Initiative |
$750,000 |
Funding
would be used for a new public health clinic in Carlinville, IL that will
provide comprehensive interdisciplinary prevention and public health services
to all residents, with special outreach to the uninsured and underserved. |
| Memorial Hospital - Carthage |
vascular
disease diagnostic services (ultrasound and CT Scanner) |
$1,160,000
|
Funding
would be used to improve the hospital's vascular disease diagnostic services
through the purchase of an Acuson ultrasound and a 64-slice CT scanner. |
| Memorial Medical Center- Springfield |
Intelligent
Pharmacy and Automated Drug Management System |
$1,000,000
|
Funding
is requested to implement the technology to provide the bar-code footprint
needed for a close-loop medication system and automated storage, and
dispensing and return processes. Implementation of this technology promotes
safety for patients and caregivers, while improving practices and systems at
the hospital. |
| Memorial Medical Center-Springfield |
Equipment
for High Def Urologic Surgery System |
$500,000
|
Funding
would be used to develop a high-definition visualization urologic surgery
system to improve endoscopic surgery, diagnosis and treatment in urology. |
| Mercer County Hospital - Aledo |
Mercer
County Hospital Renovation Project |
$250,000
|
Funding
would be used to renovate the existing facility which is over 25 years
old. Much of the infrastructure, such
as the heating, cooling and mechanical systems are near the end of their life
cycles. The State will not allow the
hospital to continue seeing patients in the existing facility. |
| OSF Healthcare System |
Electronic
Health Records Initiative |
$2,000,000
|
Funding
would be used to adopt, install and expand an Electronic Health Records (HER)
System to build on a central data repository that stores clinical, financial,
demographic, and operational information about patients. |
| Quincy University |
On
Campus Handicapped Accessibility Improvements |
$250,000
|
Funding
would be used to provide handicapped accessibility to the University's
library and adjacent areas. |
| Quincy University |
Science
& Environmental Research Center |
$1,000,000
|
Funding
would be used for equipment, instrumentation and curriculum needed to develop
a Science and Environmental Research Center at the University. |
| Reach Out and
Read National Center |
National Reach Out
and Read Program |
$10,000,000 |
Funding
is requested to maintain and expand the national Reach Out and Read (ROR)
early language development and literacy program. |
| Reading is
Fundamental |
Reading is
Fundamental Program |
$26,000,000 |
Reading
is Fundamental prepares children to read by delivering free books and
literacy resources to those children who need them most. |
| Richland Community College - Decatur |
Workforce
Development Center for Ethanol/Bio-diesel Process Technology Training |
$990,000
|
Funding
is requested to further develop an alternative fuels degree program to train
workers for the emerging biofuel industry in Illinois. |
| Richland Community College - Decatur |
Joint-Use
LEED Facility with University of Illinois (sustainable environment education
center) |
$750,000
|
Funding
is requested for a sustainable environment education program in the first
LEED certified building in central Illinois. |
| Richland Community College - Decatur |
Culinary Arts Institute |
$400,000
|
Funding
would be used to develop a culinary arts institute at Richland Community
College to respond to industry and community needs. |
| Richland Community College - Decatur |
Global
Agribusiness Center |
$720,000
|
Funding
would be used to develop learning resources to meet the education and
training demands of students and businesses by developing new educational
curriculum in biological science, food security, bio-fuel production and
process technologies. |
| Rock Island County Care Center |
Rock
Island County Care Center Facility Construction |
$1,000,000
|
Funding
would be used to construct a new 245-bed facility to replace the existing
facility that does not meet life safety codes and whose rural location makes
it difficult for families to be involved in the treatment of the resident
population. |
| Spoon River College - Canton |
Innovation and
Entrepreneurship Program |
$150,000
|
Funding
is requested to establish a rural Innovation and Entrepreneurship program at
Spoon River. This program will provide
the training, support, and assistance to help students develop
entrepreneurial skills for small business development in rural America. |
| Springfield College in Illinois |
Illinois
First Responders Education Initiative |
$500,000
|
Funding
would be used to continue and expand the existing First Responders education
program to Iraq and Afghanistan veterans and first responders throughout
central Illinois. |
| Agriculture |
|
|
|
| Requester |
Project
Name |
Amount
Requested |
Project
Description |
| Archer-Daniels Midland Company |
Evaluating Solid Fats
in the American Diet |
$5,000,000 |
Funding
would be used for a comprehensive clinical trial to evaluate the health
aspects of consuming different solid fat alternatives as a way to address
heart disease. |
| Commerce, Justice, Science |
|
|
|
| Requester |
Project
Name |
Amount
Requested |
Project
Description |
| Project
Success of Decatur and Macon County |
Truancy
Prevention and School Success Program |
$179,489 |
Funding
would be used to implement truancy prevention/intervention programming for
public school children in grades k-8 in seven elementary and two middle
schools in Decatur, IL. |
| YWCA Canton
and YWCA Sauk Valley |
Women's Economic
Empowerment Initiative |
$500,000 |
Funding
would be used to improve the economic position and employability for victims
of domestic violence through financial literacy, computer training, and
career preparation. |
| Defense |
|
|
|
| Requester |
Project
Name |
Amount
Requested |
Project
Description |
| ALION Science & Technology Center |
Illinois
Center for Defense Manufacturing |
$6,000,000 |
The
IL Center for Defense Manufacturing proposes to expand the center’s
operations to the Quad Cities, IL area. The center runs a two-part
program focused on bringing small businesses into defense supply chain and
research and development of innovative manufacturing technologies, including
titanium production. |
| John Deere Davenport Works |
Tractor,
Rubber Tired, Articulated Steering, Multi-Purpose (TRAM) |
$5,000,000 |
Funding
will be used to accelerate the procurement of additional replacement TRAMS, a
rough terrain forklift/loader used in Iraq and post-Hurricane Katrina
disaster relief activities. |
| Quad City Development Group |
Moline Bridge Repair |
$4,300,000 |
Funding
will be used to repair the Moline Bridge – the primary access control point
(ACP) for the Rock Island Arsenal – which an inspection found numerous and
significant structural damage. |
| Rock Island Arsenal |
Building 299 Roof Replacement |
$6,400,000 |
The
original roof on Building 299 has severely deteriorated and poses a serious
safety and health hazard for employees. Funding will be used to
complete the roof replacement project and properly dispose of all
asbestos-containing roof components. |
| Rock Island Arsenal |
Rock Island
Arsenal Industrial Preparedness Items |
$7,900,000 |
This
request will procure cutting-edge equipment to improve and increase
manufacturing capabilities at the RIA-Joint Manufacturing Center (JMTC) in
support of continued operations in Iraq & Afghanistan. |
| Rock Island Arsenal/Quad City Development Group |
Arsenal
Support Program Initiative (ASPI) at Rock Island Arsenal |
$8,500,000 |
The
ASPI program at Rock Island Arsenal promotes the commercial use of
underutilized capacity at the arsenal’s facilities thereby reducing
overhead and operating costs at the Arsenal and bringing a healthy return on
investment. |
| Interior |
|
|
|
| Requester |
Project
Name |
Amount
Requested |
Project
Description |
| City of Carthage, IL/Carthage Memorial Hospital |
Water
& Sewer Extension to New Hospital |
$1,500,000
|
The
funding would be used to extend water and sewer infrastructure to a new
hospital and industrial park. |
| City of East Moline, IL |
IL
1-80/1-88 Sewer Development |
$3,500,000
|
The
funding would be used to extend water and sewer infrastructure to a new
industrial park. |
| City of East Moline, IL |
General Flood
& Stormwater Mitigation Improvements |
$2,450,000
|
The
funding would be used to improve stormwater management and flood mitigation. |
| City of East Moline, IL |
General
Wastewater System Improvements |
$7,290,000
|
The
funding would be used to update wastewater treatment facilities for East
Moline. |
| City of East Moline, IL |
General
Water System Improvements |
$7,050,000
|
The
funding would be used to improve drinking water treatment for East
Moline. |
| City of East Moline, IL |
Babcock-Meersman
Water & Sewer Infrastructure Replacement |
$1,000,000
|
The
funding would be used to replace sand point wells in an economically
distressed area of East Moline. |
| City of Galesburg, IL |
One
Million Gallon Water Tower-Galesburg Logistics Park |
$500,000
|
The
funding would be used to provide adequate water storage for Galesburg. |
| City of Galesburg, IL |
Water
Treatment Facility |
$1,000,000
|
The
funding would be used for a replacement water treatment facility. |
| City of Galesburg, IL |
Water
Pipeline Replacement |
$500,000
|
The
funding would be used to repair the water pipeline between the pumping and
treatment facility. |
| City of Litchfield, IL |
Lake
Yaeger Flood Control/Water Supply |
$3,300,000
|
The
funding would be used to clean out and maintain the lake’s silt basin,
ensuring safe access to the City’s water supply. |
| City of Moline & City of Rock Island, IL |
Water
System Connections |
$75,000
|
The
funding would be used to provide redundancy between Moline and Rock Island
drinking water facilities. |
| City of Rock Island, IL |
First
Avenue Sewer Interceptor |
$1,430,000
|
The
funding would be used to comply with IEPA mandates for storm water
management. |
| City of Silvis, IL |
Sewer
Service for Fair Acres |
$250,000
|
The
funding would be used to extend sewer service to a low- to moderate-income
housing subdivision on failing septic systems. |
| Village of Carbon Cliff, IL |
Downtown
Drainage |
$2,035,000
|
The
funding would be used to manage stormwater drainage for Carbon Cliff. |
| Village of Kirkwood, IL |
Wastewater
Treatment & Collection System Improvements |
$1,045,000
|
The
funding would be used to improve wastewater treatment to comply with IEPA
violation notices. |
| Village of Kirkwood, IL |
Standby
Power for Water Plant |
$30,800
|
The
funding would be used to provide emergency back-up for pumping operations. |
| Village of Kirkwood, IL |
Well
& Appurtenances |
$163,000
|
The
funding would be used to drill and equip a new well to meet increased
demand. |
| Village of Milan, IL |
Elevated
Water Storage Facility |
$125,000
|
The
funding would be used to provide adequate water storage for Milan. |
| Village of Milan, IL |
Business
Park Water Main Extension |
$132,000
|
The
funding would be used to provide infrastructure services for a new industrial
area. |
| Village of Viola, IL |
Wastewater
Treatment Plant Update |
$981,750
|
The
funding would be used to assist Viola in complying with IEPA mandates for
water treatment. |